Transformation and M&A

Know which Day-1 process has no owner

Integration plans live in spreadsheets and steering decks that are stale by the next meeting. Transformation Programs keeps workstreams, milestones and value in one plan, checks it for gaps such as a Day-1 process with no owner, and ranks what needs your decision.

The loop

The loop on a program

  1. Step 1

    Observe

    Import the Excel tracker you run today or start from one of six templates. Event logs show how the affected processes run now.

  2. Step 2

    Model

    Workstreams, initiatives and milestones share one delivery timeline. As-is and to-be process models sit next to the plan.

  3. Step 3

    Optimize

    Plan Challenge runs 30 checks, from owner coverage and dependency cycles to Day-1 continuity and benefits counted twice.

  4. Step 4

    Act

    The attention list ranks what needs a decision. Agents propose fixes as one review batch, and the steering brief exports to PowerPoint.

Programme overview

Day 1 to Day 100 on one screen

Halvard Industries integrates Norvik Castings, a fictional acquisition, on the PMI Day 1-100 pack. Plan Challenge finds a payroll process with no owner and a freight saving counted in two workstreams. Wisp proposes the fixes as one review batch.

  • Findings ranked by the decision they need
  • Agents propose, the PM keeps or discards
The integration runs on the PMI Day 1-100 framework pack, with four workstreams on one timeline.Plan Challenge runs 30 checks on the plan: 9 rule-based, 21 reviewed by AI.Owner coverage: the Day-1 payroll process has nobody responsible for it.The value model counts the same freight saving in two workstreams.Wisp proposes fixes as one batch. Nothing enters the plan until the PM keeps it.
As-is and to-be

Check the to-be against what actually runs

Compare the as-is and to-be models, or draft a TO-BE variant with an AI action. After cutover, conformance checking replays the event log against the target model. The demo runs on the seeded lead-to-cash log.

  • Conformance against the target model
  • Variants compared, rework marked
The event log draws the process as it actually ran.Conformance checks every case against the reference model.Overlay one variant to see where it leaves the model.Compare two variants side by side.Rework loops are marked in the trace, with the time they cost.
Status

Templates, packs and what ships today

Programme templates

  • Post-merger integration
  • SAP S/4HANA
  • IT migration
  • Operating-model redesign
  • Carve-out
  • Regulatory remediation

Framework packs

  • PMI integration strategy
  • PMI Day 1-100
  • SAP Activate
  • ADKAR
  • Benefits realization
  • Regulatory remediation
  • Transformation ProgramsWorkstreams, initiatives, milestones, a delivery timeline and a steering brief, in Finder > Transformations.Live
  • Plan Challenge30 checks on the plan: 9 rule-based, 21 reviewed by AI.Live
  • Value modelA value bridge from benefit, cost, dis-synergy and one-time cost to net value.Live
  • Agent proposalsFindings, workstreams, initiatives, milestones and value hypotheses arrive as a review batch. Agents never write to the plan directly.Live
  • Excel and PowerPointImport an existing Excel tracker. Export the steering pack to XLSX and PPTX.Live
  • As-is and to-beCompare two process models, draft a TO-BE variant and check conformance against the event log.Live
  • Weekly overdue reports and decision remindersPrivate to each person. Production scheduling is not certified yet.Beta
  • M&A target researchConfidential, case-scoped screening, comparison, red flags, a decision memo and independent review. Case managers grant access, and an eligible case hands off into a PMI programme.Beta
  • One TO-BE from several variantsReconciles variants into one reviewed TO-BE draft. In review, not released yet.Preview

No valuation and no synergy estimates: the value model holds the figures your team enters. People outside an M&A case do not see its targets.

Bring the tracker you run today

Send us the Excel tracker of a live program. We import it, run Plan Challenge on it with you and go through the findings.